San Simon Resort – Slovenia

Project statistics
700

MWh

saved annually

Reduction of energy costs by

50

%

Situation before the contract and client requirements

The San Simon Resort is located in the town of Izola, on the Slovenian coast. The hotel used a crude oil boiler with a total capacity of 800 kW for heating, which was in very poor condition. In addition, the hotel Mirta was disconnected from the remote heating of the San Simon Resort. 

Resalta solution

Installation of 3 external high temperature heat pumps with EVI compressors (65°C) with a combined power of 450 kW as a main heat source.

In the summer 1 to 2 heat pumps are used for cooling, while the remaining heat pumps are used for heating sanitary water.
The existing boiler room was reconstructed to retain existing boilers for peak demands by maintaining a hydraulically low temperature of the return medium.

For the wellness building, two additional high temperature (80°C) heat pumps with a combined power of 32 kW were installed.
The old chiller was removed, as the newly installed system can provide cooling for the hotel through connected fan coils.

Want to see more?

Download our brochure.

Terms and conditions.

By subscribing to our newsletter you agree to receive e-mail communications from Resalta d.o.o. The aim of our newsletter is to keep visitors to the website, partners, clients and the general public informed of the work Resalta does, its new projects, developments, upcoming events as well as news concerning energy efficiency and renewables. The frequency of the newsletter issues will be at most monthly, with possible exceptions for unscheduled yet important news. We reserve the sole right to either modify or discontinue the newsletter, at any time and without notice to you. We take your privacy seriously and will never communicate or sell your information to third parties. You can unsubscribe from the newsletter at any time.