Situation before the contract and client requirements
Gorenje’s facilities in Velenje were using natural gas cogeneration (CHP) units for heat energy supply with 880 kW of combined heat power and 654 kW of electrical power.
The required heat was 31,420 MWh annually, with an estimated 4,000 annual operating hours of the CHP.
Resalta solution
Integration of the right size of cogeneration (CHP) on natural gas; 850 kW of electricity and 929 kW of thermal power.
Resalta monitors the system through Resalta‘s central control system (web access) in real time, operating and maintaining the plant, also selling heat and electricity to the client.