Situation before the contract and client requirements
Before reconstruction, the client had an over-dimensioned steam system, operating inefficiently with a very poor yield.
The client had low pressure process steam, and no return of condensate.
The client wanted to decrease costs and increase system efficiency.
Resalta solution
Resalta provided solutions in heat recovery, steam for industrial usage, engineering and issued a savings warranty.
Resalta installed two new steam boilers carefully adapted to the actual needs of Žito Maribor, including a system for the heat recovery of flue gases.
Resalta monitors the system through Resalta‘s central control system (web access) in real time.