Situation before the contract and client requireme
The client had no built-in comfort cooling in the production hall and used natural gas to heat the production hall.
Required cold: 460 MWh annually.
Required heat: 510 MWh annually.
The client wanted the highest level of savings.
Resalta solution
Analysis of the existing ventilation system and preparation of an energy efficient solution: reversible air/water cooling unit with integrated hydraulic module and high efficiency.
A reversible high efficiency heat pump was installed with a cooling capacity of 310 kW and a heating capacity of 340 kW (under Eurovent conditions).