Hotel Histrion – Slovenia

Project statistics

Supplied heating energy costs reduced by

69

%

Total heating costs reduced by

17

%

Cooling costs reduced by

37

%

Situation before the contract and client requirements

The hotel used two chillers with a combined power of 590 kW, with a 4-way piping system, for cooling, and for heating a boiler with extra light fuel oil.

The entire existing cooling and heating system was obsolete and the hotel was incurring high costs of energy.

During works, the hotel had to operate without interruptions. 

Resalta solution

Resalta replaced two old chillers with one reversible heat pump (air/water), 590 kW capacity with an integrated hydro module. 

In summer time the heat pump covers all the cooling demand, in winter time it is the primary heating source in combination with boilers. 

The existing boiler room was reconstructed to retain the existing system for peak demands. 

Resalta provides energy supply of cold and heat. The whole system is connected to Resalta‘s central control system.

Want to see more?

Download our brochure.

Terms and conditions.

By subscribing to our newsletter you agree to receive e-mail communications from Resalta d.o.o. The aim of our newsletter is to keep visitors to the website, partners, clients and the general public informed of the work Resalta does, its new projects, developments, upcoming events as well as news concerning energy efficiency and renewables. The frequency of the newsletter issues will be at most monthly, with possible exceptions for unscheduled yet important news. We reserve the sole right to either modify or discontinue the newsletter, at any time and without notice to you. We take your privacy seriously and will never communicate or sell your information to third parties. You can unsubscribe from the newsletter at any time.