Izoterm Plama is following its green path, already producing insulation material that is ecologically sound.
On the roof of the Izoterm Plama building in Podgrad, Slovenia, we have installed a 466 kWp solar power plant, which will generate an estimated 476 MWh of electricity per year and reduce our carbon footprint by 233 tonnes per year.
Resalta and Izoterm Plama have signed a 15-year power purchase agreement.
The project was completed in December 2023.