Challenges
Indoor climate and shower design. Kermi delivers both with exceptional competence. And for more than six decades. With pioneering solutions and ingenuity.
Company Kermi launched a partnership with Resalta in May 2022.
Resalta's solution
The 300 kWp photovoltaic power plant was completely installed in January 2024. It is expected to generate 300 kWp of renewable energy annually, leading to a reduction of CO2 emissions by 136 tons per year.