Situation before the contract and client requirements
Ljubljana Castle announced a public tender for the reconstruction of its natural gas boiler room.
The existing equipment was inefficient and heat was not evenly distributed throughout the whole castle.
Resalta solution
Resalta delivered and implemented the whole system. This included construction work, mechanical installations and electrical installations.
The implemented solutions included:
- Natural gas boiler: 2 x 1 MW
- Heating water storage: 7 m3